Étude technique de réhabilitation des pistes au sein de la commune de Sidi abdellah
Articles demandés
- Etude topographique, 1 F
- Etude géotechnique, 1 F
- Etude technique, 1 F
- Etablissement de l’avant métré et estimation des travaux, 1 F
Analyse IA de Safqa
Technical studies for rehabilitating tracks within Sidi Abdellah commune: the route from RN9 to douar Ben Khiran and the track serving douar Lgraa (about 16.4 km total), plus the route from the secondary road linking Sidi Abdellah to Sidi Ghanem via Khiam El Raji to douar Rtiba, connecting back to the initial axis (about 5.3 km).
Exigences clés
The topographical study must be prepared by an IGT registered with ONIGT, at the BET’s expense; a convention with an ING is to be provided to the contracting authority. The geotechnical study must be prepared by a laboratory approved by the contracting authority, at the BET’s…
Déjà inscrit ? Se connecter
Préparez votre réponse avec Safqa
Tous les marchés de Commune SIDI ABDELLAH
Autres bons de commande à Rehamna
Travaux d’entretien et réparation du bâtiment administratif de l’espace de la mémoire historique de la résistance et de la libération à BIR GANDOUZE Relevant à la Délégation De HCARMAL À OUED EDDAHAB
Delegue Provincial au Haut Commissariat aux Anciens Resistants et Membres Armee de Liberation de Oued Eddahab
Impression et travaux de tirage
Conservateur du Palais Badia a Marrakech
Achat des produits et outils de nettoyage
Commune BOURROUS
Contrôle de la qualité des travaux de reconstruction d’un dalot sur la RN9 au : • PK221+500 • PK202+400 -PROVINCE DE RHAMNA-
Service de l'Equipement du Transport et de la Logistique de Rhamna