Commune SIDI ABDELLAH
En coursBon de commande

Étude technique de réhabilitation des pistes au sein de la commune de Sidi abdellah

Articles demandés

  • Etude ‎topographique, 1 F
  • Etude ‎géotechnique, 1 F
  • Etude technique, 1 F
  • Etablissement de l’avant métré et ‎estimation des ‎travaux, 1 F

Analyse IA de Safqa

Technical studies for rehabilitating tracks within Sidi Abdellah commune: the route from RN9 to douar Ben Khiran and the track serving douar Lgraa (about 16.4 km total), plus the route from the secondary road linking Sidi Abdellah to Sidi Ghanem via Khiam El Raji to douar Rtiba, connecting back to the initial axis (about 5.3 km).

Exigences clés

The topographical study must be prepared by an IGT registered with ONIGT, at the BET’s expense; a convention with an ING is to be provided to the contracting authority. The geotechnical study must be prepared by a laboratory approved by the contracting authority, at the BET’s…

Créer mon compte gratuit pour tout lire

Déjà inscrit ? Se connecter

Préparez votre réponse avec Safqa

Tous les marchés de Commune SIDI ABDELLAH

Autres bons de commande à Rehamna